Simulation of riding the future Green Line Post published:February 26, 2014 Post category:Green Line What will riding the Green Line extension look like? Check out this simulation of a ride from the new Lechmere station to College Ave, as shown at a Feb 24 public meeting. Randy Henke, Director of Design for AECOM/HNTB, provides the narration. You Might Also Like Somerville Journal: DEP Green Line hearing December 29, 2005 Coverage of maintenance facility hearing December 21, 2009 Construction method approved for Green Line June 4, 2012