Green Line
0

Analysis of Green Line tunnel options

Some have wondered if tunnels might be a better option for part of the Green Line extension, and now the State has released its analysis of some tunneling options. Not surprisingly, it concludes that the additional cost isn’t worth it. Read the study (PDF).

Related Posts
Green Line update
Mayor Curtatone on the Green Line Extension
Green Line preliminary engineering and design contract: $24.5 million